Circutor CDP-0 Manual de usuario Pagina 29

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 74
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 28
CDP
Instruction Manual 29
Table 12: CDP-G programming (Single-phase installation with 3 loads to connect).
VARIABLE
VALUE
Inverter power
10000 W
Number of inverters
1
Phase control
Single-phase
Injection margin
0 %
Load management Mode
Dynamic
Max. modulation value
90 %
Max. grid contribution
50 %
Reconnecting time
5 minutes
Relay 1
Relay 2
Relay 3
Power
2000 W
Power
2000 W
Power
1000 W
Min.
connection
time
2 minutes
Min.
connection
time
2 minutes
Min.
connection
time
90 minutes
Max. modulation value = 90%. This means that as long as the ratio be-
tween Pconsumed/Available PV Power is below 90%, the CDP-G will try to
connect the associated loads.
Max. grid contribution = 50%. This means that as long as the load can op-
erate with less than 50% of the power in the distribution lines, the CDP-G will
keep the loads connected. If it needs more than 50% of the grid power, it will
disconnect the loads connected to the relays.
In this situation, the CDP-G checks its working conditions to connect the first
load:
Condition 1:

 
100 .  
(


100 = 40%) 40% ≤ 90% this condition is met
Condition 2:
-If Injection Margin = 0% It checks whether:
Pgrid < 2 x (0.03) x Pconsumed
-If Injection Margin ≠ 0% It checks whether:
Pgrid < 2 x Injection Margin x Pconsumed
0 < 2 x 0.03 x 4000 this condition is met
If the 2 conditions are met, the relay closes and connects
the load. (Figure 27)
Vista de pagina 28
1 2 ... 24 25 26 27 28 29 30 31 32 33 34 ... 73 74

Comentarios a estos manuales

Sin comentarios