Circutor CDP-0 Manual de usuario Pagina 39

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 74
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 38
CDP
Instruction Manual 39
Figure 40: Third screen on the measures menu.
4- Inductive reactive energy consumed.
US corresponds to the user's energy, GR is the energy from the grid and
PV is that from the inverter.
The units are kVArh and the resolution is set with one decimal place:
Figure 41: Fourth screen on the measures menu.
5- Capacitive reactive energy consumed.
US corresponds to the user's energy, GR is the energy from the grid and
PV is that from the inverter.
The units are kVArh and the resolution is set with one decimal place:
Figure 42: Fifth screen on the measures menu.
6- Active energy generated by each of the three phases.
US corresponds to the user's energy, GR is the energy from the grid and
PV is that from the inverter.
The units are kWh and the resolution is set with one decimal place:
Figure 43: Sixth screen on the measures menu.
7- Inductive reactive energy generated.
US corresponds to the user's energy, GR is the energy from the grid and
PV is that from the inverter.
The units are kVArh and the resolution is set with one decimal place:
Figure 44: Seventh screen on the measures menu.
Vista de pagina 38
1 2 ... 34 35 36 37 38 39 40 41 42 43 44 ... 73 74

Comentarios a estos manuales

Sin comentarios