W 0.1 W
Power injected into
the phase 1 grid.
12
W 0.1 W
Power injected into
the phase 2 grid.
13
GRID INJECTION
W L3
W 0.1 W
Power injected into
the phase 3 grid.
14
PERCENT L1
% 1%
percentage of the
nominal power of the
15
PERCENT L2
% 1%
percentage of the
nominal power of the
16
PERCENT L3
% 1%
percentage of the
nominal power of the
17
PV Wh
Wh 1 Wh
Energy generated by
the inverter
18
LOAD Wh
Wh 1 Wh
Energy consumed by
the load
19
CONSUMPTION
Wh 1 Wh
Energy consumed by
the grid
20
GRID INJECTION
Wh 1 Wh
Energy injected into
the grid
21
R1 STATUS
Dis : Disabled
M0: Manual mode,relay deactivated.
M1: Manual mode, relay activated.
D0:Dynamic mode,relay deactivated.
D1: Dynamic mode, relay activated.
managing non-critical
22
R2 STATUS
managing non-critical
23
R3 STATUS
managing non-critical
(2)
The sign criteria in the Data Logger file:
Positive power = consumption
Negative power = generation