1�- General
In this window, Figure 46, enter the following parameters,Table 8.
Table 8:Create a new tariff (General)
Parameter Description
Tariff name Name of the tariff
Tariff description
(3)
Description of the tariff
Contract types
Drop-down list where the type of contract can be selected:
Flat rate, Contract 1: Flat rate for power
Purchase of units, Contract 2: Purchase of energy units
Purchase of EDA units, Contract 3: Purchase of EDA units
EDA Flat rate, Contract 4: EDA Flat rate
(3)
These elds are not mandatory.
2�- Tariff Costs
The tariff costs and period of time during which they are linked are entered in this window,
Figure 47.
Figure 47:Create a new tariff (Tariff Costs)
The costs of the tariff depend on the type of contract that has been selected.
Table 9:Create a new tariff (Tariff Costs)
Parameter Description
Price of energy unit
Cost of the energy unit in €/kWh
Only for Type 2,3 and 4 contracts.
Price of contracted power
Cost of contracted power in €/kW per Day, Week or Month.
(The period of time can be selected)
Net balance fee
An access charge can be applied to customers that have their own
self-powered generators. € per Day, Week or Month.
(The period of time can be selected)
44